Skip to product information
1 of 4
Brand: DAB Pumps

DAB E.SYDOCK Docking Station NPT | 1-1/4 in Base for One E.SYBOX

DAB E.SYDOCK Docking Station NPT | 1-1/4 in Base for One E.SYBOX

SKU: SKU:727955

Ordering a large quantity of this item?
As long as the order total is more than $2K you can:

Regular price $269.00 USD
Regular price Sale price $269.00 USD
Sale Sold out
Shipping calculated at checkout.

The DAB E.SYDOCK docking station holds one E.SYBOX booster and carries all of its plumbing. As a quick connection base, it lets the pump drop in or lift out without touching the pipework.

View full details

DAB E.SYDOCK Docking Station for a Single E.SYBOX

The E.SYDOCK is the single-pump docking base DAB makes for the E.SYBOX booster. It carries the suction and discharge connections, so the plumbing attaches to the dock rather than to the pump. Both ports are threaded 1-1/4 in NPT. They can sit on either side of the dock, or both on the same side, which saves elbows in a tight utility room. The E.SYBOX then seats onto the dock and connects to it directly. That arrangement lets an installer finish the pipework before the pump arrives on site. It also means the pump can come off without cutting or unthreading a single line. Seasonal greenhouses use that to bring the pump indoors before the first hard frost. A spare unit can go in quickly if the working pump ever needs service. The dock is made for the standard E.SYBOX only.

Plumbing a Quick Connection Base Into a Fertigation Line

Fit a ball valve on each side of the dock so the pump can be isolated without draining the whole system. Set the dock on a level, solid surface close to the tank it draws from. Leave clear space around and above it for lifting the pump on and off. Pressure-test the finished pipework with the ports capped before seating the pump for the first time. Flexible connectors between the dock and hard pipe keep vibration from traveling into the plumbing. Once the pump is docked, priming and setup follow the normal E.SYBOX routine. Before a winter shutdown, close the valves, lift the pump out and drain the dock. That leaves nothing inside the base to freeze and split. The dock adds a little footprint and cost to a single-pump install. Those are paid back the first time the pump comes out in minutes instead of an afternoon.

Key Features

  • Pre-plumb before the pump: All pipework connects to the dock, so the system can be finished and tested before the pump is installed.
  • Side-selectable ports: Suction and discharge can sit on either side or on the same side, which fits most utility-room layouts.
  • Pump removal without cutting pipe: The E.SYBOX lifts off the base, which makes winter storage and service swaps quick.
  • Cleaner pump connections: The dock takes the plumbing loads, so the pump body carries no hard-piped strain.
  • Matched to the E.SYBOX: Built for the standard E.SYBOX, so the pump seats square and seals on the base.

Technical Specifications

Specification Value
Ports 1-1/4 in NPT suction and discharge
Port layout Either side, or both on the same side
Compatible pump One E.SYBOX (standard model only)
Function Docking base for removing the pump without disconnecting plumbing